October 8, 2013
Dear Home Owners:
The final paving for the last half of The Isles at Waterway Village is scheduled to begin on Thursday, October 10, 2013 and Friday, October 11, 2013. Please be advised that this time frame could change due to weather, mechanical breakdowns, or scheduling delays. The Contractor plans to start the job between 7 a.m. and 8 a.m. Travel will be restricted for much of the day on one side of the street or the other. Please do not park your vehicle(s) on the side of the road which is being paved. You may use the clubhouse parking lot depending on your need to travel. Please remember that the first 48 hours after the paving work is finished your AUTOMOBILE TIRES CAN CARRY THE FRESH ASPHALT BLACK COLOR ONTO YOUR PAVER DRIVEWAYS, WE RECOMMEND NOT DRIVING INTO YOUR DRIVEWAY FOR THIS PERIOD OF TIME. PLEASE ALSO REMEMBER THAT SHOES CAN ALSO TRACK THIS ONTO WALKWAYS AND PAVERS.
Generally, one side of the street will be open at all times for vehicle traffic, but patience and careful driving will be required while the work proceeds. There will be a Paving Crew supervisor in place assisting with traffic flow. It is imperative you avoid getting the wheels of your vehicles on the “tack” surface, which is sprayed onto the road a short distance ahead of the paving machine. Do not drive or walk on the “tack” surface. PLEASE REMEMBER TO CHECK YOUR SHOES BEFORE WALKING ON YOUR WALKS, DRIVES, OR INTO YOUR HOMES. Paving materials are difficult to remove from these surfaces, and the developer is not responsible for removing the tack surface from your driveways or walkways if you should accidentally drive or walk on the areas. ADDITIONALLY, PLEASE DO NOT MAKE SHARP TURNS OR TURN YOUR WHEELS WHILE IN PLACE FOR AT LEAST THE FIRST 72 HOURS AFTER THE SECOND LIFT HAS BEEN APPLIED. Sharp turns can damage the new asphalt. The developer will not be responsible for roadway damage caused by residents.
Please cooperate with the work crews as they progress through the community. We apologize in advance for any inconvenience this roadwork may cause. Thank you for your patience and cooperation while this work proceeds.
Sincerely,
Rosie Velez
Property Manager
Capital Realty Advisors
No comments:
Post a Comment